Rigging

Your Anchor will be two straps placed across the Bridge’s floor beams.  On Rope 1 made these rigging straps w/padding (minimum breaking strength (MBS) approximately 16,000 pounds).  The straps meet NFPA and ANSI certification requirements. 10 mm Delta screw links will be provided to connect the D-rings.  The straps will be put in place on Friday, the day before Bridge Day™.  Whoever is rigging the team's respective anchor must have a safety line and/or be on belay.  We require your assistance in taking the straps down as you derig at the end of Bridge Day™ on Saturday afternoon.

 



  • rafting

    WV Rafting

    White water rafting in West Virginia on the New River and Gauley River.

  • climbing

    Rock Climbing

    Rock climbing and rappelling in West Virginia's New River Gorge.

  • caves

    WV Caving

    West Virginia caving tours and trips.

  • teams

    Team Building

    West Virginia team building excercises.